Water over the front step
A hypothetical house with a long front eave.

The starting point
Runoff spills near the entry instead of reaching the outlet.
What to check
The assessment would check gutter condition, pitch, and outlet layout.
The project plan
A replacement run could use a better-planned downspout route.
From start to finish
- The roof edge and support would be reviewed.
- The run and outlet positions would be laid out.
- The gutter and downspout would be fitted as one system.
The final checks
The aim is to carry roof runoff along a planned route.




